Bethel, Maine

Interior Renovations

This project is renovations of a 5,000 SF Bank. Scope included demolition of existing partitions, millwork, floor covering electrical system, existing toilets and computer system wiring. The project was completed in phases to minimize interruption of services and customer convenience. New drywall was installed throughout, all windows and exterior doors replaced, new floor coverings, ceilings, and millwork along with new electrical system, HVAC renovations and alarm system. A propane fireplace was added in the lounge area of the lobby.

OWNER: Norway Savings Bank
ENGINEER/ARCHITECT: Platz Associates
CONTRACT AMOUNT: $525K
DATE OF COMPLETION: March 2020

Related Projects

4/19/2024 At the new home of the Crane and Rigging

4/19/2024 At the new home of the Crane and Rigging Division Laydown Yard in South Paris, 5 cranes were prepped and assembled for OSHA inspections. With flying colors, the Liebherr

4/21/2023 It couldn’t come soon enough for the weather-hardened crew

4/21/2023 It couldn’t come soon enough for the weather-hardened crew at Middle Dam to finish up for the winter season and turn their taillights to the project. This winter’s scope

6/28/2024 After reporting on Bancroft24 and its voyage up to

6/28/2024 After reporting on Bancroft24 and its voyage up to Maine, it felt appropriate to continue the narrative on Bancroft’s Marine Division as things are really starting to take shape

7/26/2024 Bancroft Contracting’s Marine Division has successfully completed and put

7/26/2024 Bancroft Contracting’s Marine Division has successfully completed and put the first job in the books! D. Stetson Services approached Bancroft with the need to get this work done quickly,

Scroll to Top